I suggest you ...

Test Explorer Window Should Show Time Stamp for When the Tests Last Ran.

16 votes
Vote
Sign in
(thinking…)
Sign in with: facebook google
Signed in as (Sign out)
You have left! (?) (thinking…)
Jim shared this idea  ·   ·  Flag idea as inappropriate…  ·  Admin →

2 comments

Sign in
(thinking…)
Sign in with: facebook google
Signed in as (Sign out)
Submitting...
  • Anonymous commented  ·   ·  Flag as inappropriate

    It would also be helpful to have a column in the Test Suites that will show LastRun Date. There is currently Last Run By, and Last Run Duration.

  • Anonymous commented  ·   ·  Flag as inappropriate

    The Summary view in Test Explorer does not refresh while tests are running. This makes it hard to determine if you are looking at the results of the last run or if the current run has finished and you're looking at those results. Adding a time stamp to the view would take away ambiguity.

Feedback and Knowledge Base