I suggest you ...

In the project type for Azure Resource Groups add a dashboard designer for creating azure dashboard ARM template.

In the Azure Resource Group project template include a template and a basic designer for creating an operations dashboard. It would be nice if it was included by default for an RG project, and any resource that is added includes a small 1x1 tile that links to that resource. This would make it easier to hand off to operations when the solution is deployed.

6 votes
Vote
Sign in
(thinking…)
Sign in with: facebook google
Signed in as (Sign out)
You have left! (?) (thinking…)
Mike Benkovich shared this idea  ·   ·  Flag idea as inappropriate…  ·  Admin →

0 comments

Sign in
(thinking…)
Sign in with: facebook google
Signed in as (Sign out)
Submitting...

Feedback and Knowledge Base