I suggest you ...

In the project type for Azure Resource Groups add a dashboard designer for creating azure dashboard ARM template.

In the Azure Resource Group project template include a template and a basic designer for creating an operations dashboard. It would be nice if it was included by default for an RG project, and any resource that is added includes a small 1x1 tile that links to that resource. This would make it easier to hand off to operations when the solution is deployed.

6 votes
Vote
Sign in
Check!
(thinking…)
Reset
or sign in with
  • facebook
  • google
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    Mike Benkovich shared this idea  ·   ·  Flag idea as inappropriate…  ·  Admin →

    0 comments

    Sign in
    Check!
    (thinking…)
    Reset
    or sign in with
    • facebook
    • google
      Password icon
      Signed in as (Sign out)
      Submitting...

      Feedback and Knowledge Base